1.4M Android Apps Tracked Updated 4 min ago Revenue Forecasts
Add an app Create Account Sign In
Home

Project planning

62
Quality Score
Solid

Project planning

Medium confidence
5.0 Google Play rating
✍️ GetAppValue analysis

Project planning is an Android app from J de Montcheuil in the Productivity category, currently rated 5.0★ across 259 ratings. Initial signal reads as mixed reviews: supporters praise core features while critics cite stability and value gaps.

Quality Score is 62: Solid (established niche player). For a Productivity app, that means established niche player. The full BU Investment Matrix below scores 8 dimensions including monetisation, growth, and operational risk.

Track changes month-over-month in the Performance section below: live snapshot history and revenue forecast included.

💰 Monthly revenue · now vs forecast
● Right now
$5.0K
per month
12-mo forecast
$5.2K – $10.8K
per month
24-mo forecast
$6.4K – $19.2K
per month
MID tier
💡 Grow this revenue
Free AI audit of this app’s store listing
  • Title & subtitle keyword fit
  • Description hook & conversion structure
  • Screenshots, ratings, reviews strategy
Run free AI audit →
Typical impact: +2-5× organic installs
🔔Notify me when this app's revenue changes by

📊 Performance Tracking LIVE

Loading…
idle
0%
Rating
Reviews
Forecast Revenue / mo
Snapshots tracked
0
since first record
ONE-TIME · BUILD 💰 Estimated build cost
$85K
What it cost to build · not monthly revenue
Likely range $65K – $115K
$25K · MVP floor $100K · indie scale $500K+ · studio build
📈 Slow ROI — current MRR is well below build cost

Synthetic estimate. Inputs: category complexity, file size, screen count, monetization layer, platform reach, age × team-size proxy. Calibrated against 2024-2026 indie-agency rate surveys. Full math + source list on /methodology.

Where the money goes
🧱 MVP baseline (design + 1-store ship) +$28K
📱 5 unique screens × $4.5K +$22K
Productivity complexity ×1.10 +$5K
🌐 Cross-platform reach (iOS + Android) +$30K
Total estimate $85K
👥 Estimated audience size
19K
Lifetime downloads (US-equivalent)
Monthly active
5.7K
Daily active
2.5K

Synthetic estimate from ratings × category benchmarks. Calibrated against 2024-2026 mobile-attribution retention + DAU/MAU reports. Numbers are US-storefront-equivalent — true global audience can be 5-10× larger for international apps. Full math + source list on /methodology.

How we sized it
📲 Productivity engagement ~75 installs / rating
🔁 Productivity D30 retention 30%
📍 DAU / MAU stickiness 0.45
DAU / MAU 44% sticky
🔬

How we forecast this revenue

MEDIUM CONFIDENCE
Baseline
$5.0K/mo · ML-estimated from 234 triggers
Growth rate
+4.0% MoM · MID tier baseline (compound monthly)
6 months
$4.7K – $7.9K
12 months
$5.2K – $10.8K
24 months
$6.4K – $19.2K
Compound growth at +4.0% MoM (tier baseline for MID). Range widens with horizon — typical noise band ±25% at 6mo.. Ranges widen with horizon — distant futures carry more uncertainty.
📊

BU Investment Matrix

Below median · 45/100MID TIERunderperforming peers
RevenueQualityMarketGrowthMoatSafetyFounderMonetiz.
Revenue Strength
3.7
Product Quality
7.0
Market Position
0.0
Growth Velocity
5.0
Defensibility
7.5
Operational Safety
7.0
Founder Strength
4.8
Monetization Maturity
1.0
  • 💰 Revenue: Modest — $3K - $7K/mo · MID tier · medium confidence, trajectory unclear.
  • ⭐ Quality: 5.0★ across 259 reviews — solid.
  • 📍 Market: Not yet charting in any of the 9 monitored markets.
  • 📈 Growth: ⚠ last update 904d ago — possibly dormant.
  • ⚠️ Risk: Moderate — dormant (904d since update).
🎯 For competitors: Mixed picture. Worth competing if you have a clear UX or pricing edge — otherwise crowded segment.
💵 For acquirers: Estimated asking range 18-32× monthly = $90K-$160K.
Composite of 8 dimensions computed deterministically from public signals — no LLM, every score traces back to a measurable input. Default weights shown; "compete" / "acquire" / "invest" lenses re-weight without re-fetching.
Range:

💰 Forecast Revenue / mo

MODEL
Revenue forecast computed from BU's 234 trigger model on each snapshot. Calibrated against ground-truth from 58 verified-revenue apps.
🔬Forecast Breakdown — Why This Estimate?Top 4 of 4 triggers
Our ML model uses 200+ signals from public data. These are the most influential for this app:
Excellent rating (5.0★)METRIC
+$2,200
Mature app (14y old)METRIC
+$1,500
Ad-supported / freemiumMETRIC
+$600
Early-stage install base (259 ratings)METRIC
+$400
METRIC = structural app data · REVIEW = mined from user reviews · ✓ VERIFIED = Stripe-verified anchor (TrustMRR)

📈 Reviews Growth

LIVE
Cumulative review count from first BU snapshot. Each point = a tracked update.

⭐ Rating Trend

LIVE
Average rating evolution. Updates with each new review batch.

Profile & Insights

Everything we know — and don't — about this app and its company.

Identification

App name
Project planning
Developer
J de Montcheuil
Bundle ID
jmontch.planner
App Store URL
Open in App Store
Category
Productivity
Content rating
Not found
Languages
Not found

Company

Website
jmontch1.web.app
Tagline
Not found
Description
Not found
Founded
Not found
HQ / Address
Not found
Employees
Not found
Logo
Not found

Revenue

Reported revenue signal / mo
Not found
AI revenue estimate / mo
Not found
AI annual estimate
Not found
ML model estimate / mo
$115/mo
Top-grossing rank
Not found
All-time revenue
Not found
Pricing
Not found

Founder

Founder data not yet collected for this app.

Funding

Funding data not yet collected for this app.

Press & Links

Press & Links data not yet collected for this app.

Contacts & Socials

Contacts & Socials data not yet collected for this app.
Profile is built from iTunes Lookup + developer site scrape + ML revenue model. Empty fields show "Not found" — additional sources (Crunchbase, X, IndieHackers, Acquire.com) coming.

📝 About this app

Project planning plans the tasks of a project. It establishes a project schedule based on tasks and task relationships, and allows you to manage the project schedule and task assignment.
The results are presented in the form of tables, a Gantt chart and a dependency diagram.

This program was specially designed for a phone or tablet, with the aim of simplifying data entry and clearly presenting results. For that :
- the durations of tasks and delays are in whole numbers of working days,
- planning is only as soon as possible with fixed task durations,… View full description on the official store →
App Specs
🔐 Own this app? Claim & verify MRR →
🔖 vVaries with device🔄 updated 0d ago📂 Productivity💰 Free📺 Ad-supported
🔔

Track this app’s revenue

FREE
Get an email when revenue moves by your threshold. No spam, unsubscribe in one click.

📝 Description

95
BU Score · Transcendent
Full revenue analysis
Read the article-style breakdown for Project planning: category rank, percentile, growth signal, comparable apps, and how the forecast is calibrated against verified-MRR anchors in this niche.
Read deep-dive →

More by J de Montcheuil

View all →
📦 Portfolio summaryINDIE studio
8apps·$206/mocombined
Lead-app heavy — top app contributes 56%

Similar apps in Productivity

About this analysis
ZCAnalyzed by Zakhar Chumak · founder, GetAppValue·Full methodology·Medium confidence

Why medium confidence: 259 ratings · no founder-verified revenue (model estimate only).

Frequently Asked Questions

4 answers · auto-generated from this app's public data
How much does Project planning make per month?
Based on our ML-calibrated revenue forecast, Project planning earns approximately $288/mo. This is a US-storefront-equivalent estimate; global revenue can be several times larger for internationally-distributed apps. See the methodology page for the full formula and confidence bands.
What apps are like Project planning?
Browse the full Productivity category catalog to find similar apps with revenue, build cost, audience and tech stack data. Each /p/{slug} page also shows a Compare side-by-side widget with three peer apps from the same niche.
Who makes Project planning?
Project planning is published by J de Montcheuil on the Google Play Store. See the full publisher portfolio (other apps by the same developer) via the More by developer block on the product page above.
What is Project planning's BU Score?
Project planning has a BU Score of 62/100 (Solid). The score combines App Store rating, ratings count, monetization model and revenue signals calibrated against founder-verified MRR anchors. See the BU Score formula.